Feasibility study – LFG utilization Rivne MSW Landfill, Ukraine
Objective: to perform an assessment of the Landfill site and amount of LFG available and the options for the LFG utilization at Rivne MSW Landfill
Activities: evaluation of the LFG quality and availability through a pump test; evaluation of the technical and economical options for the implementing of full-scale system of LFG recovery and utilization; evaluation of the available LFG utilization options, including flaring, electricity generation and direct use.
Place of implementation: Rivne MSW Landfill, Ukraine
Execution period: 2009-2010
Project financing: Environmental Protection Agency, United States of America (US EPA); Methane to Markets Partnership (M2M)
Main project parameters
Number of wells: | 3 wells and 6 probes |
Average LFG flow rate: | 27.8 m3/hour |
Average CH4 content in LFG: | 38.8 % |
Expected GHG emission reductions: | 2.5-2.6 th. t СО2-eq |
Total project cost: | $3 522377 flaring option
$4 463306 CHP option |
Utilization of LFG: | Flaring
Combined heat and power generation |